七七久久,黄片XXxx,jizz久久,无码社区

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類(lèi)
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://www.afrolucha.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷(xiāo)商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

電纜橋架的支、吊架的配置要求

水平敷設(shè)時(shí),支架間距一般不應(yīng)大于2000mm。

When laying horizontally, the spacing between supports should generally not exceed 2000mm.

彎頭附近應(yīng)增設(shè)支架,彎頭半徑小于300mm時(shí),應(yīng)在彎頭兩端各300-600mm處設(shè)置一個(gè)支架。

A bracket should be added near the elbow. When the radius of the elbow is less than 300mm, a bracket should be set at 300-600mm at each end of the elbow.

02

垂直單層敷設(shè)時(shí),支架間距不應(yīng)超過(guò)2000mm。多層時(shí)應(yīng)通過(guò)計(jì)算確定。

When laying vertically in a single layer, the spacing between supports should not exceed 2000mm. When there are multiple layers, they should be determined through calculation.

立柱應(yīng)與托盤(pán)、梯架層間距離相適應(yīng),以便多層布置。

The distance between the columns and the pallets and ladder layers should be suitable for multi-layer layout.

吊桿不應(yīng)使用小于10mm的圓鋼,應(yīng)有防晃措施,端部應(yīng)有固定措施。

The suspension rod should not use round steel smaller than 10mm, and anti sway measures should be taken. The end should have fixing measures.

豎井內(nèi)敷設(shè)時(shí),每3-5層設(shè)置一個(gè)承重支架,不應(yīng)安裝在固定電纜的橫擔(dān)上。

When laying in the vertical shaft, a load-bearing bracket should be installed every 3-5 layers and should not be installed on the cross arm of the fixed cable.

固定支架與預(yù)埋件焊接時(shí),焊縫應(yīng)滿足質(zhì)量要求,長(zhǎng)度不應(yīng)少于25mm。

When welding fixed brackets and embedded parts, the weld seam should meet quality requirements and the length should not be less than 25mm.

使用膨脹螺栓時(shí)應(yīng)符合相關(guān)標(biāo)準(zhǔn)規(guī)定。

The use of expansion bolts should comply with relevant standards and regulations.

支架安裝應(yīng)垂直、無(wú)明顯扭曲,高度誤差不超過(guò)公差要求。

The bracket installation should be vertical, without obvious distortion, and the height error should not exceed the tolerance requirements.

支架的設(shè)計(jì)和安裝應(yīng)滿足其強(qiáng)度、剛度和穩(wěn)定性的要求。

The design and installation of the bracket should meet its requirements for strength, stiffness, and stability.

主體鋼結(jié)構(gòu)上不得焊接支、吊架,應(yīng)征得結(jié)構(gòu)許可。

Welding of supports and hangers is not allowed on the main steel structure, and a structural professional permit must be obtained.

支、吊架的設(shè)計(jì)應(yīng)根據(jù)托盤(pán)、梯架的規(guī)格、層數(shù)、跨距等條件進(jìn)行配置,并滿足載荷要求。

The design of supports and hangers should be configured according to the specifications, number of layers, span, and other conditions of pallets and ladders, and meet the load requirements.

托臂的開(kāi)孔位置應(yīng)協(xié)調(diào)層間距離的要求。立柱可預(yù)留可調(diào)節(jié)的長(zhǎng)孔。

The opening position of the support arm should be coordinated with the requirements of interlayer distance. The column can reserve adjustable long holes.

支、吊架的規(guī)格和型號(hào)應(yīng)在滿足載荷條件下,根據(jù)項(xiàng)目的實(shí)際情況選擇。

The specifications and models of supports and hangers should be selected according to the actual situation of the project while meeting the load conditions.

金屬支、吊架應(yīng)進(jìn)行防腐處理,特別是戶外和潮濕環(huán)境的。

Metal supports and hangers should undergo anti-corrosion treatment, especially in outdoor and humid environments.

支、吊架的設(shè)計(jì)計(jì)算和試驗(yàn)應(yīng)驗(yàn)證其滿足強(qiáng)度、剛度和穩(wěn)定性要求。

The design calculation and testing of supports and hangers should verify that they meet the requirements of strength, stiffness, and stability.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
99视频精品全部免费免费观看| 国产激情久| 四虎影视成人永久免费观看视频| 午夜性视频| 韩日高清国内自拍| 日韩无码地址一| 亚洲第一视频在线| 色五月婷婷五房| 岚皋县| 疯狂做受XXXX高潮视频免费| 青青日在线| 手机黄色在线你懂的| 波多野结衣1区2区| 国产美女一级特黄大片| 久久久久久久国产毛片| 中文字幕高清一区二区三区| 四虎成人影视8848亚洲| 丰满熟妇乱伦视频一区| 男人的天堂欧美日韩| 亚洲天堂国产| 青青久草| 在线视频亚洲免费| 大肉大捧一进一出好爽视频动漫 | 亚洲AV无码专区在线电影| 国产手机在线精品| 亚洲精品亚洲人成在线下载| 呦呦视频在线观看完整版| 九色精品| 久久久久久AV无码免费网站下载| 亚洲视频第一页视频| 亚洲成人蜜桃| 日韩欧美人妻| 欧美精品人妻人伦a v久久| 欧美亚洲国产精品| 色偷偷噜噜噜亚洲男人| 国产精品视频WWW| 欧美日韩国产一二三区| 一区区别视频| 久久热av| 日本一在线中文字幕| 久久精品亚洲精品婷婷|